A Change In The Plan
A rumor anout two months ago that the foundation of the Qarfleld monmnont wns uñaste cauoed quite n local sensatton, nm a i'iiiiuiiittfK di engiueern wis apKinted to in v esi sute the matter. Jt now transpires that it was decided at the Mme of tlir invtístigation to reduce the bigbt o( the monument from 225 feet, as origioally designed, to 150 íeet. This reduouoD lo bight the contractor, Mr. Simmons, claims wat decided apon liy the trustees, and that )t will lessen the cost of the monuiinni abont $20,000, whlcb sum wil! be expeuded in decorating the iuterior aud Luautifying the grouuds.
Article
Subjects
Old News
Ann Arbor Democrat