Exterior Of The Newly Constructed Detroit Metropolitan Airport, September 1958
Published In
Ann Arbor News, September 26, 1958
Caption
EXIT ON GROUND LEVEL: Deplaning passengers and others will use the lower level as an exit. Attendants will bring cars from a nearby lot to a ground floor door. The ramp (center) is the entranceway, leading from an elevated roadway to the main lobby of the glass and steel terminal building. The modern terminal is part of a $25,000,000 project.
Ann Arbor News, September 26, 1958
Caption
EXIT ON GROUND LEVEL: Deplaning passengers and others will use the lower level as an exit. Attendants will bring cars from a nearby lot to a ground floor door. The ramp (center) is the entranceway, leading from an elevated roadway to the main lobby of the glass and steel terminal building. The modern terminal is part of a $25,000,000 project.
Year
1958
Month
September
Rights Held By
Donated by the Ann Arbor News. © The Ann Arbor News.
Copyright
Copyright Protected