Press enter after choosing selection

Aerial Photograph of the Proposed US 12 Overpasses, Ypsilanti Township, May 1959

Aerial Photograph of the Proposed US 12 Overpasses, Ypsilanti Township, May 1959 image
Year:
1959
Published In:
Ann Arbor News, May 20, 1959
Caption:
Controversial Overpass Locations: This aerial view shows the two locations for a proposed bridge to carry traffic over the US-12 Expressway east of Grove Rd. in Ypsilanti township. The State Highway Department says it will construct an overpass (solid line) to connect Hull and Glenwood Aves. as soon as the Township Board approves the location. Residents of the area maintain the overpass should be built about 1,000 feet eastward and connect Harris Rd. (dotted line) across the Expressway. The large housing development at lower left is part of the Shady Knoll Subdivision.

Aerial Photograph of US-12 Expressway Southeast of Ypsilanti, September 1958

Aerial Photograph of US-12 Expressway Southeast of Ypsilanti, September 1958 image
Year:
1958
Published In:
Ann Arbor News, September 19, 1958
Caption:
New Expressway Cutoff Opened: This $1,028,864 cutoff of the US-12 Expressway southeast of Ypsilanti was opened to traffic yesterday. The cutoff (center) carries through Expressway traffic from a point near McGregor Ave. to S. Harris Rd. (lower right). The former Expressway lanes (across center) will continue to be used for local area traffic. The project, slated for completion by Nov. 30, eliminates two sharp curves in the Expressway and shortens the actual travel distance by nearly two miles. Part of the West Willow Subdivision area is at top left.