New School of Business Administration will be ready soon, January 1948 Photographer: Maiteland Robert La Motte

Year:
1948
Published In:
Ann Arbor News, January 20, 1948
Caption:
BUSINESS BUILDING IN USE SOON: Occupancy in February is scheduled for sections of the new School of Business Administration which is located on a site bounded by Tappan Ave., Haven Ave., and Monroe St. The two million dollar structure has a nine-story tower which will have offices and research rooms. The three-story sections on Haven and Monroe Sts. will be used for classrooms and laboratories. Some of the architectural features found in the new building are aluminum window frames, acoustic tile ceilings, and a heating system which uses concealed wall convectors.
Ann Arbor News, January 20, 1948
Caption:
BUSINESS BUILDING IN USE SOON: Occupancy in February is scheduled for sections of the new School of Business Administration which is located on a site bounded by Tappan Ave., Haven Ave., and Monroe St. The two million dollar structure has a nine-story tower which will have offices and research rooms. The three-story sections on Haven and Monroe Sts. will be used for classrooms and laboratories. Some of the architectural features found in the new building are aluminum window frames, acoustic tile ceilings, and a heating system which uses concealed wall convectors.
Copyright
Copyright Protected
Addition to the East Engineering Building, 500 block of E. University Ave., January 1948 Photographer: Maiteland Robert La Motte

Year:
1948
Published In:
Ann Arbor News, January 20, 1948
Caption:
ENGINEERING STUDENTS STUDY HERE: This four-story addition to the East Engineering Building in the 500 block of E. University Ave. was occupied last fall, even though not completely finished. Students could learn engineering practice both in and between classes as workmen filled the halls, working on interior finish details. The structure, erected at an estimated cost of $1,470,000, is built of concrete, stone and brick to harmonize with the architectural style of the original engineering building, shown at the far left of this photograph. The new addition houses the aeronautical and electrical engineering departments of the College of Engineering of the University. Third floor is to be devoted almost entirely to electronics and communications equipment.
Ann Arbor News, January 20, 1948
Caption:
ENGINEERING STUDENTS STUDY HERE: This four-story addition to the East Engineering Building in the 500 block of E. University Ave. was occupied last fall, even though not completely finished. Students could learn engineering practice both in and between classes as workmen filled the halls, working on interior finish details. The structure, erected at an estimated cost of $1,470,000, is built of concrete, stone and brick to harmonize with the architectural style of the original engineering building, shown at the far left of this photograph. The new addition houses the aeronautical and electrical engineering departments of the College of Engineering of the University. Third floor is to be devoted almost entirely to electronics and communications equipment.
Copyright
Copyright Protected
University's Current Building Program Moving Toward Completion During Coming 12 Months

Parent Issue
Day
20
Month
January
Year
1948
Copyright
Copyright Protected
Prof. Anthony Heads Language Institute

Parent Issue
Day
9
Month
October
Year
1963
Copyright
Copyright Protected
- Read more about Prof. Anthony Heads Language Institute
- Log in or register to post comments
New Building To Be Started

Parent Issue
Day
15
Month
March
Year
1946
Copyright
Copyright Protected
- Read more about New Building To Be Started
- Log in or register to post comments
Woman Dies After Fall Down Stairs

Parent Issue
Day
7
Month
January
Year
1946
Copyright
Copyright Protected
- Read more about Woman Dies After Fall Down Stairs
- Log in or register to post comments
Winner Pays Debts, Sets Up College Fund

Parent Issue
Day
22
Month
November
Year
1973
Copyright
Copyright Protected
- Read more about Winner Pays Debts, Sets Up College Fund
- Log in or register to post comments
Construction Begins For Auto Agency

Parent Issue
Day
20
Month
May
Year
1965
Copyright
Copyright Protected
- Read more about Construction Begins For Auto Agency
- Log in or register to post comments
Workers In U-M Underground Tunnels, August 7, 1947 Photographer: Maiteland Robert La Motte

Year:
1947
Published In:
Ann Arbor News, August 7, 1947
Caption:
Welding is a hot enough business even on a cool day, but add the smothering temperatures which have visited Ann Arbor this week and you get a job few men would envy. Harold Dapprich of Ypsilanti, the welder in the above picture, isn't quite as warm as you may think, however. He is at work replacing a steam main in the University's underground tunnel system where the temperature is some eight degrees cooler than outside. It's a different story in tunnels leading to the buildings which use steam for cooking or sterilizing purposes. There the temperature gets as high as 120 degrees.
Ann Arbor News, August 7, 1947
Caption:
Welding is a hot enough business even on a cool day, but add the smothering temperatures which have visited Ann Arbor this week and you get a job few men would envy. Harold Dapprich of Ypsilanti, the welder in the above picture, isn't quite as warm as you may think, however. He is at work replacing a steam main in the University's underground tunnel system where the temperature is some eight degrees cooler than outside. It's a different story in tunnels leading to the buildings which use steam for cooking or sterilizing purposes. There the temperature gets as high as 120 degrees.
Copyright
Copyright Protected
- Read more about Workers In U-M Underground Tunnels, August 7, 1947
- Log in or register to post comments
Tunnels Honeycomb U-M Campus

Parent Issue
Day
7
Month
August
Year
1947
Copyright
Copyright Protected
- Read more about Tunnels Honeycomb U-M Campus
- Log in or register to post comments